Meristem BIOSOLAR
The array is ballasted by the roof it stands in, and runs cooler for it.
- Depth
- 5" (130 mm)
- Saturated load
- 38 lb/ft² saturated
- Annual retention
- 58%
- Max slope
- to 2:12
- Wind
- Ballast calculated per array layout, RP-14 method
- Fire
- ASTM E108 Class A, 24" vegetation-free zone at array
- Planting
- Low-grow sedum, kept below panel edge
- Maintenance
- 2 visits/year, coordinated with O&M
- Install rate
- 3,000 ft²/day, 3-person crew
- Roofs asked to do solar and bylaw at once
- Cooler array microclimate
- Ballast without penetrations
If a drawing in your set names one of these, it is asking for Meristem BIOSOLAR.
SolarMat HybridSMH
Ballast calculation replaced the fixed-block detail.
V-PV 120VPV-120
Renamed only. Array spacing detail revised for 24" fuel break.
9 documents cover this system
Typical assembly details — all systems
CAD + BIM · v9.0
Drain, penetration and expansion-joint details
CAD + BIM · v9.0
Load table — saturated and dead loads, all systems
Performance data · v3.1
Wind uplift test report — ANSI/SPRI RP-14
Performance data · v2.2
Fire classification certificate — ASTM E108
Performance data · v1.4
Pre-installation checklist + membrane sign-off
Installation · v3.0
Maintenance schedule + plant establishment care
Maintenance · v5.1
Warranty registration form
Warranty + safety · v4.0
Safety data sheet — engineered growing media
Warranty + safety · v2.1
Meristem LITE